Posts

Showing posts with the label Duferco
Steelplanner Optimises Duferco's Supply Chain Duferco La Louviere has implemented two Steelplanner modules for the optimisation of its supply chain, complementing the existing Steelplanner environment. The first additional module is Betamatcher Midterm for the optimal Hot Strip Mill coffin selection. To efficiently manage a HSM, a planning department must tackle two complex and consecutive problems: the assignment of slabs to orders and the scheduling of those assigned slabs. Traditionally, these two logistical problems are solved independently. However, this way of working has many drawbacks. This may result in assigned slab-populations that are not feasible to schedule or that result in poor schedule-quality. The implementation of Betamatcher at Duferco La Louviere has resolved these issues. It has solved the assignment problem and the HSM-scheduling critical constraints in one optimisation round. Mr Tufaru, planning manager at Duferco, said: 'Betamatcher Midterm added...